• Reset

Formliner Project: I-91 Brattleboro Bridge

Project:  I-91 Brattleboro Bridge Improvements

Owner: Vermont Agency of Transportation

General Contractor: PCL Civil Constructors Inc & Figg Engineering J/V

Project Location: Brattleboro, VT (I-91 bridge over West River)

Application: Bridge piers

Custom Rock Scope of Work:
#1305 Vista Drystack formliner, custom sized parts and molded corners to fit piers

Description:
This expansive design/build bridge improvement project began in 2013 as a joint venture between PCL Civil and Figg Engineering, for VTrans.

The Brattleboro bridge was designed as more than a simple transportation connection for vehicles but “A Bridge to Nature,” for hikers and other visitors to enjoy the nature surrounding them and the beauty of the bridge – with its textured concrete piers finished in a drystack stone pattern, inspired by the stunning Vermont landscape – from the viewing platforms at the base of each pier.

Learn more about the project at the official website, where you can also see the project from its start in the construction gallery.

For more info call or contact us:
Custom Rock Formliner – Main Office
2020 West 7th Street
St. Paul, MN 55116
Phone: (651) 699-1345
Fax: (651) 699-1830
info@customrock.com
https://customrock.com/

Related Posts

Providing the most realistic textures in the industry

At Custom Rock, we hold firmly that our clients include not only the Contractors and Precasters that use our formliner, but also the Project Owners and Architects. We always strive to exceed all our clients expectations through unmatched aesthetics, quality products, and timely delivery.

We pride ourselves on being an information resource in both the design and construction phase of any project. Feel free to contact us anytime. We’re here to help!